Electrical

10/13/09

Home
Update Blog
Original Photos
Ripout Photos
The Framing
The Bomb Shelter
Insulation
Drywall
Electrical
Mechanical Room
Painting
Boys Rooms
Misc

 

Electrical

 

12/12/2008 It is time to replace the panel so we can install the extra circuits and the hot tub breaker

What a great looking panel, Actually mounted in the celing.

This is much better

04/06/2008 Finished the kitchen electrical. Now I can re-insulate and re-drywall.

 

Home | Update Blog | Original Photos | Ripout Photos | The Framing | The Bomb Shelter | Insulation | Drywall | Electrical | Mechanical Room | Painting | Boys Rooms | Misc

This site was last updated 10/13/09